Scope Project

File types

The ERP should handle the files people already work with.

01

Model packages

CATIA, TEBIS, drawing, revision, linked part, linked job, classification, owner, and verification metadata.

02

Documents

Policies, work instructions, training records, released documents, review dates, and revision status.

03

Quality evidence

Inspection records, CAPA evidence, calibration references, supplier certs, compliance support, and traceability files.

04

Training media

Security awareness, HR training, shop-floor walkthroughs, and support videos can live with the operating manual.

Scale target

Configured for up to 12 GB per supported model file.

01

API limit

The server-side model file limit is configured at 12288 MB for Matrix-ERP.

02

Metadata first

Even when large file storage is staged, records can carry classification, ownership, linked work, revision, and verification metadata.

03

Governed access

File references should respect roles, access groups, controlled data markings, and audit expectations.

Keep navigating

Move through the Citadel-Matrix site by buyer problem.

Explore Matrix-ERP, aerospace ERP, custom software, integrations, module depth, security, files, scaling, implementation, architecture, and use cases from one connected navigation path.

Request Workflow Audit